Single Storey to Cafe Makeover (In Progress)
Project Scope
Our ongoing works include:
- Interior and exterior repainting
- Wall refurbishment and surface preparation
- Ceiling repair and finishing
- Flooring works (based on design requirement)
- Waterproofing (wet areas)
- General repair and upgrading works
Every stage is planned to ensure durability, clean finishing, and alignment with the café concept.
Current Progress
The project is actively progressing with key structural and finishing works underway.
Surface preparation, repair works, and initial coatings are being executed to ensure a strong foundation before final finishing.
Why This Transformation Matters
Converting a single-storey unit into a café is not just about appearance — it’s about:
- Enhancing space usability
- Creating a strong brand environment
- Improving customer experience
- Increasing property commercial value
Poor execution in renovation can lead to long-term issues like cracks, peeling paint, and costly rework. That’s why proper preparation and quality control are critical.
Work Process
- Site assessment & planning
- Surface preparation & repair
- Structural and finishing works
- Painting and detailing
- Final touch-up & inspection
End Goal
To deliver a fully functional, visually appealing café space that is ready for operation and capable of attracting consistent customer traffic.
28 Apr 2026